Audit the pulse. Calculate the deviation from nominal grid frequency (50/60 Hz) and assess the risk of automatic under-frequency load shedding (UFLS) or generator tripping.
In a synchronous grid, frequency is the proxy for the balance between generation and load. If the frequency drops to 59.95 Hz, it means load exceeds generation, and the rotating mass of generators is slowing downβrisking a cascading blackout if not corrected in milliseconds.